Vent Termination Requirements - Weil-McLain Series 2 Manual

Wall mount gas-fired water boilers
Hide thumbs Also See for Series 2:
Table of Contents

Advertisement

®
S
2
-
— Boiler Manual
ERIES
G
AS
FIRED WATER BOILER

Vent termination requirements

Figure 24
The vent termination must be located to meet all requirements below (also applies to vertical vent terminations). The minimum distance from
adjacent public walkways, adjacent buildings, openable windows and building in the National Fuel Gas Code, ANSI Z223.1/NFPA 54 and/or
the Natural Gas and Propane Installation Code, CAN/CSA B149.1. The vent termination clearances below are for U.S.A., for Canadian vent
termination clearances please refer to the requirements of CAN/CSA B149.1 Natural Gas and Propane Installation Code. Consideration
VKRXOG EH JLYHQ WR DYRLG SRVVLEOH GDPDJH FDXVHG E\ YHQW SOXPHV DQG FRQGHQVDWH ZKHQ FKRRVLQJ D YHQWLQJ FRQ¿JXUDWLRQ DQG ORFDWLRQ
Maintain a minimum clearance of 4 ft. (1.22m) horizontally from, and in no case above or below, unless a 4 ft. (1.22m) horizontal distance
is maintained, from electrical meters, gas meters, regulators, and relief equipment.
26
Part number 550-142-190/1218

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eco 110Eco 155Eco 70

Table of Contents