Weil-McLain Series 2 Manual page 14

Wall mount gas-fired water boilers
Hide thumbs Also See for Series 2:
Table of Contents

Advertisement

®
S
ERIES
Boiler hydrostatic test
Figure 8
Install pipe fi ttings for relief valve and
pressure/temperature gauge —
NOT mount relief valve until AFTER
hydrostatic testing
1 Boiler supply (outlet) connection, (male, 1" NPT )
2 Boiler return (intlet) connection, (male, 1" NPT )
3 Boiler relief valve, shipped loose with boiler — DO NOT mount relief valve until AFTER hydrostatic testing.
3a TEMPORARILY ONLY — Insert a ¾" NPT plug in the relief valve tapping of the reducing tee. This MUST BE REMOVED after
the test and the relief valve mounted here.
4 Pressure/temperature gauge, shipped loose with boiler
5a Reducing tee, NPT, 1 " x 1 " x ¼" on 70/110, & 1 ¼" x 1 ¼" x ¼" on 155, shipped loose with boiler
5b Reducing tee, NPT, 1 " x 1 " x ¾" on 70/110, & 1 ¼" x 1 ¼" x ¾" on 155, shipped loose with boiler
6 Nipple, NPT 1" x close on 70/110, & 1 ¼" x close on 155, shipped loose with boiler
7 Bushing, NPT, 1 ¼" x 1", shipped loose with boiler (155 only)
8 Nipple, NPT 1" x close on 70/110, & 1 ¼" x close on 155, by installer
9 Isolation valve on supply connection, by installer (1" NPT on 70/110, 1¼" NPT on 155)
10 Isolation valve on return connection, by installer (1" NPT on 70/110, 1¼" NPT on 155)
11 ¾" NPT boiler drain valve, shipped loose with boiler — after hydrostatic testing, move drain valve to lowest point on the return piping if not
already there.
14
2
-
G
AS
FIRED WATER BOILER
DO
(see legend below)
1
3
Piping to system
2
Piping from system
11
— Boiler Manual
(continued)
Figure 9
Install piping components required for
hydrostatic test (
(155 only)
Recommended but
not included
(155 only)
see legend below)
Part number 550-142-190/1218

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eco 110Eco 155Eco 70

Table of Contents