Download Print this page

Real Good Toys Bigger Best1 Quick Start Manual page 4

Dollhouse wiring set

Advertisement

Dollhouse Wiring Quickstart Guide
Mark for Sconce Runs
using the 5
1/ 2
" length of the
Layout Stick from the floor.
Mark the Ceiling Loops using the 5
out Stick from the back edge of the floor. If your house has
electrification slots ("e-slot") close to the middle of the floor
front-to-back, draw the Ceiling Loop to line up with the e-slot.
Mark for the Ceiling Run
Ceiling
Wall
The Main Loop goes thru
the E-Slot
Lay the Base Run in a single piece with no cuts or interrup-
tions just above the Baserun line all the way around the doll-
house. Go thru the dividers' doors to get to the next rooms.
Get around the Front Door with folded corners to avoid
extra connections in the tapewire.
Folded - no eyelets
1/ 2
" length of the Lay-
Lay the Main Loop using the e-slots or stair cutouts to get
from floor-to-floor. If you have an e-slot in the Base Floor,
run the Main Loop all the way into the cellar.
Lay the Sconce Runs just above the 5
Lay the Ceiling Loop following the Marks. The Ceiling
Loop will connect to the Main Loop or to the Baserun, up the
wall, across the ceiling, and back down the wall to the Base-
run again. The Ceiling Loop will connect the Sconce Runs
to the rest of the dollhouse wiring. Connect the Ceiling Loop
on both ends to make the dollhouse wiring connections more
trouble-free.
The Ceiling Loop is side-to-side, the Ceiling Run is front-to-back.
Lay a Ceiling Run front-to-back in the center of each room
or wherever your plan needs power for ceiling lights.
The Jack and Plug: Drill a
(note, the Jack is sized for up to a
your foundation is thicker, create a pocket for the jack by
carving or drilling so that it can mount
outside surface). The Jack must be close enough to the main
loop so the connection wire on the Jack can easily reach.
Remove the nut and glue the Jack into the hole. Let the glue dry.
1
/
"
Drill
2
1
/
" sconce run mark.
2
the Ceiling Loop
At least 1" overlap
copper-over-copper
blue-over-blue
The Main Loop
1
/
" hole thru the foundation
2
1
/
" thick foundation. If
2
3
/
8 - 1
/
" " from the
2
Jack (take off the nut)
Page 4
Glue

Advertisement

loading

This manual is also suitable for:

7999