Floor standing oil fired condensing boiler conventional flue & room sealed flue for fully pumped open vent or sealed central heating systems and domestic hot water cylinders (20 pages)
External oil fired condensing boiler
using balanced flue system
for fully pumped open vent or sealed central heating systems and
domestic hot water water cylinders (20 pages)
Ri series, cdi classic regular series regular gas-fired condensing
wall mounted boiler range (44 pages)
Summary of Contents for Worcester greenstar camray 12/18
Page 1
GREENSTAR CAMRAY UTILITY & UTILITY SYSTEM 12/18, 18/25, 25/32 FLOOR STANDING OIL FIRED CONDENSING BOILER CONVENTIONAL FLUE & ROOM SEALED FLUE FOR FULLY PUMPED OPEN VENT OR SEALED CENTRAL HEATING SYSTEMS AND DOMESTIC HOT WATER CYLINDERS THE APPLIANCE IS FOR USE WITH 28 SECOND KEROSENE THE APPLIANCE IS FOR USE WITH 28 SECOND KEROSENE ONLY ONLY...
Page 2
LABC will then arrange regular inspection visits during the work to ensure that the installation complies with the regulations. IF YOU ARE IN ANY DOUBT CONTACT THE WORCESTER TECHNICAL HELPLINE. DISTANCE LEARNING AND TRAINING COURSES ARE AVAILABLE FROM WORCESTER. PLEASE LEAVE THESE INSTRUCTIONS WITH THE COMPLETED COMMISSIONING FORM AND THE USER MANUAL WITH THE OWNER OR WITH THE APPLIANCE AFTER INSTALLATION OR SERVICING.
The Control of Pollution (Oil) Regulations. OFTEC Standards. Where no specific instruction is given, reference should be made to the relevant codes of practice. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25-25/32 SAFETY PRECAUTIONS 8 716 113 004b (05.07) & INSTALLATION REGULATIONS...
SEDBUK (Band A) 93.1 93.2 94.2 Appliance protection rating Weight (excluding packaging) Utility Weight (excluding packaging) Utility System Emissions class for NOx and CO class INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25-25/32 TECHNICAL DATA 8 716 113 004b (05.07)
Run the boiler and system at normal operating temperature in accordance with the manufacturer's instructions. Drain and thoroughly flush the system to remove the flushing agent and any debris. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25-25/32 CLEANING PRIMARY SYSTEMS 8 716 113 004b (05.07)
• Any system connected to the boiler must not have a separate electrical supply. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25-25/32 MAINS SUPPLY 8 716 113 004b (05.07)
The table and illustration above is a guide only and does not in any way override the de- as the sole fire protection device. aerator manufacturers instructions. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25-25/32 OIL SUPPLY 8 716 113 004b (05.07)
Heating return Auto air vent Non return 1000mm above valve the highest point of the system Stop cock Fill Point INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25-25/32 WATER SYSTEMS & PIPEWORK 8 716 113 004b (05.07)
(min.10mm clearance) is removable for 25/32 275 25/32 275 maintenance and repair and the front of the boiler is not enclosed. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25-25/32 BOILER LOCATION & CLEARANCES 8 716 113 004b (05.07)
All pipework in bathrooms and shower rooms must be cross bonded. 600mm radius A - Bath or shower cubicle (zone 0) INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25-25/32 BOILER LOCATION & CLEARANCES 8 716 113 004b (05.07)
'Contact Information' on the back cover. A - Boiler B - Flue C - Max. 2 bends at 135° D - Anti down-draught terminal E - Chimney INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25-25/32 CONVENTIONAL FLUE 8 716 113 004b (05.07)
At all times the correct method for handling heavy objects should be strictly observed. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25-25/32 UNPACKING THE BOILER 8 716 113 004b (05.07)
In the case of the Utility System take care not to damage the expansion vessel. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25-25/32 BOILER INSTALLATION 8 716 113 004b (05.07)
The horizontal terminal must be installed at 3° to ensure that the condensate drains back to the boiler whilst also preventing rain ingress down the air duct. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25-25/32 FLUE INSTALLATION 8 716 113 004b (05.07)
Plan sectional view Plan sectional view 25/32 IMPORTANT when refitting Plan sectional view the combustion chamber access door (6) Combustion chamber access door tightening sequence. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25-25/32 COMBUSTION CHAMBER 8 716 113 004b (05.07)
(L). IMPORTANT: The condensate trap must be correctly filled to prevent the possibility of potentially harmful flue products escaping via the condensate pipework. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25-25/32 PIPEWORK CONNECTIONS 8 716 113 004b (05.07)
(not supplied) to the oil pump and return pipe fixing (D on page 24) and tighten to secure. (on 12/18 model only) Brass air deflector washer Locating circlip INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25-25/32 OIL BURNER & PUMP 8 716 113 004b (05.07)
(G) in the bottom locations. Plug burner lead (H) into control box. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25-25/32 REFITTING COMPONENTS 8 716 113 004b (05.07)
Secure in place by retightening the expansion vessel clamping screw. Refit the top and front panels. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25-25/32 PRE-COMMISSIONING CHECKS - 8 716 113 004b (05.07) APPLIANCE...
The (A) in use and (B) must be bled. Bleed air from the primary heat exchanger air vent (B). INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25-25/32 FILLING THE SYSTEM 8 716 113 004b (05.07)
The internal filter is accessed by removing the oil pump cover. INTEGRAL BURNER LOCKOUT INDICATOR AND Safely dispose of the container/discharge. RESET BUTTON (H) INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25-25/32 STARTING THE APPLIANCE 8 716 113 004b (05.07)
Page 36
(L) to obtain * 25/32 model for 25kW remove the plastic air guide (see following page ). the correct CO level. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25-25/32 STARTING THE APPLIANCE 8 716 113 004b (05.07)
Page 37
Remove the two screws (C) securing the plastic air guide. Remove air guide (D) and reassemble the burner in reverse order. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25-25/32 STARTING THE APPLIANCE 8 716 113 004b (05.07)
Page 38
Burner and circulating pump should be off. Check that any other controls that are fitted to the system are operating properly. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25- STARTING THE APPLIANCE 25/32 8 716 113 004b (05.07)
Clean or replace all oil filters. Check that the condensate system is not obstructed, clean and refill the condensate trap as necessary. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25-25/32 INSPECTION AND SERVICE 8 716 113 004b (05.07)
Page 42
(on 12/18 model only) the room. Brass air deflection washer Locating circlip G - Retaining screws - cover H - Cover - oil pump INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25-25/32 INSPECTION AND SERVICE 8 716 113 004b (05.07)
Page 43
A fire valve sensor clip (Q) is sequence. provided for this purpose. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25-25/32 INSPECTION AND SERVICE 8 716 113 004b (05.07)
Set up as in installation instructions Oil pressure incorrect Adjust to correct pressure Incorrect components used on Check with installation instructions combustion head Faulty nozzle Replace nozzle INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25-25/32 FAULT FINDING 8 716 113 004b (05.07)
Service Provider. Before completing the appropriate Service Interval Record below, please ensure you have carried out the service as described in this manual. Always use Worcester, Bosch Group specified spare parts when replacing all controls. INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25-25/32 OIL BOILER COMBUSTION 8 716 113 004b (05.07)
Page 52
SERVICE 2 SERVICE 1 DATE DATE ENGINEER NAME ENGINEER NAME COMPANY NAME COMPANY NAME TEL No. TEL No. OFTEC REG No. OFTEC REG No. PUMP PRESSURE: PUMP PRESSURE: NOZZLE CHANGED? NOZZLE CHANGED? F.G.T. °C FLUE PRESSURE: F.G.T. °C FLUE PRESSURE: COMMENTS COMMENTS SIGNATURE...
12/18 baffles in tubes 1 & 4. 18/25 baffles in tubes 1, 3 & 4. 25/32 baffles in all 6 tubes. COMBUSTION CHAMBER ACCESS DOOR INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY UTILITY 12/18-18/25-25/32 BAFFLE ARRANGEMENT 8 716 113 004b (05.07) DIAGRAM...
Page 56
EXCELLENCE COMES AS STANDARD Worcester, Bosch Group Cotswold Way, Warndon, Worcester WR4 9SW. Tel. 01905 754624 Fax. 01905 754619 Worcester, Bosch Group is a trading name of BBT Thermotechnology UK Ltd. www.worcester-bosch.co.uk 8 716 113 004b (05.07)