Battery Upgrade Procedure
Figure 8. Remove the Old Two-Row Battery Tray
8.
Slide two new single-row trays in place of the tray that was removed. The two new single-row trays are
now side-by-side with one old dual-row tray on the same shelf, forming two battery strings (see
Figure 9. Slide Two Single-Row Battery Trays into Place
9.
Re-install the battery retaining bracket and secure using the two M5 bolts removed in
Figure
10. Cut the tie wrap securing the UPS battery harness to the battery retaining bracket (see
6
Battery Upgrade Instructions for 9355 (20–30 kVA)
10).
—Rev 01
Figure
9).
Step
6(see
Figure
10).