Checking Operation Of The Appliance; Specific Maintenance Operations; Draining The Heating Circuit; Cleaning The 500-Μm Filter - Baxi AWHP 22 TR–2 Installation And Service Manual

Reversible air/water split inverter heat pump
Hide thumbs Also See for AWHP 22 TR–2:
Table of Contents

Advertisement

10 Maintenance
10.2

Checking operation of the appliance

Fig.95
Fig.96
10.3

Specific maintenance operations

1
2
Fig.97
1
90
iHPI
This function is used to force the heat pump and back-up in heating or
cooling mode, in order to check that they are working correctly.
MW-5000132-5
MW-5000750-1
10.3.1
10.3.2
Clean the filters during the annual service.
2
MW-6000360-1
1. Access the Test menu by pressing the two keys on the left
simultaneously.
XX represents the flow temperature
2. Switch from C:XX heating to R:XX cooling mode using the
keys.
3. Exit the Test menu and go back to the main display by pressing the

key.

Draining the heating circuit

1. Connect a hose (internal diameter: 8 mm) to the drain valve on the
heating circuit.
2. Open the drain valve.
3. Await the complete drainage of the heating circuit.
Cleaning the 500-µm filter
1. Close the filter valve.
2. Unscrew the cover (24-mm spanner).
and
7701563 - v02 - 22052018

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Awhp 27 tr-2Platinum bc imax 27Platinum bc imax 22

Table of Contents