Siemens SINAMICS IOP-2 Operating Instructions Manual page 68

Intelligent operator panel 2
Hide thumbs Also See for SINAMICS IOP-2:
Table of Contents

Advertisement

Options
8.2 Hand-held device
1. Intelligent Operator Panel (IOP-2)
2. IOP-2 release catch
3. ON/OFF switch
4. Charging LED - ON when charging, OFF when charged
5. 9-pin Sub-D male connector (RS232)
6. Charging unit input
7. Battery compartment cover
8. IOP-2 retaining screw
Fitting the batteries
The hand-held device is powered by four 'AA' rechargeable batteries; these batteries are
supplied with the hand-held kit. The batteries are fitted as shown in the figure below.
Figure 8-5
68
Installing batteries for handheld kit
Intelligent Operating Panel 2 (IOP-2)
Operating Instructions, 04/2017, FW V2.0, A5E39549448B AA

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents