Flanged Models Fpd350.(H6/H7/H8).E1 - ABB FPD350 Torbar Instructions Manual

Averaging pitot tubes
Table of Contents

Advertisement

FPD350 Torbar
Averaging pitot tubes

2.15 Flanged Models FPD350.(H6/H7/H8).E1

Warning. Flanged models FPD350.(H6/H7/H8).E1 are
designed for 'Hot-Tap' installation. Observe all relevant
safety precautions for drilling into pressurized pipelines, and
ensure the process material does not exceed the Torbar's
specified pressure and temperature limits.
Install the Torbar as follows:
1. Install the flanged pipe fitting (stand-off) – see Section
2.18, page 24.
2. Referring to Fig. 2.14:
a. Fit isolation valve
B
(stand-off)
.
b. Attach hot-tap drilling equipment to isolation valve
A
in
accordance
instructions.
c. Drill a 6 mm (0.24 in) pilot hole in the process pipe at
the marked position, then drill to the appropriate size
– see Table 2.8.
Flanged Torbar
Model
Hole size in mm (in)
Table 2.8 Hole Size
d. Withdraw the drill, close isolation valve
remove the hot-tap drilling equipment.
e. Ensure 6 packing rings are located correctly inside
C
packing gland
f. Ensure the drawbolt (or optional geared) retraction
D
assembly
is in the fully retracted position.
g. Fit flanged pressure chamber
C
packing gland
A
isolation valve
h. Insert the Torbar into packing gland
i.
Turn the Torbar until the indentation marks on the
head are positioned downstream of the flow – see
Fig. 2.1, page 3.
j.
Tighten the packing gland bolts
evenly until the packing gland is fully sealed,
ensuring the Torbar is able to slide through it.
18
A
to flanged pipe fitting
with
the
manufacturer's
FPD350.H6.
FPD350.H7.
FPD350.H8.
E1
E1
E1
16 (0.5)
28 (1.0)
65 (2.4)
A
fully and
.
E
, complete with
D
and retraction assembly
.
C
.
F
equally and
k. Carefully open isolation valve
leaks around packing gland
Note. During step l, turn drive nuts
evenly to prevent binding.
l.
Drawbolt retraction assembly only – turn each
drive-nut
passes through isolation valve
opposite side of the process pipe. When the Torbar
is inserted fully, ensure the drawbolts
J
nuts
m. Drawbolt retraction assembly only – tighten lock
K
nuts
Note. The gear retraction handle is supplied loose
and can be fitted to either side of the gears.
However, ensure the handle is fitted so that the
Torbar is inserted when the handle is turned
clockwise.
n. Optional geared retraction assembly only – turn
the integral handle clockwise until the Torbar
contacts the opposite side of the process pipe.
o. Fully tighten packing gland bolts
Torbar does not turn. Check for leaks.
3. Check the Torbar is installed correctly and aligned.
, to
2 Initial Installation
A
C
.
G
G
clockwise alternately until the Torbar
A
and contacts the
are in the positions shown.
.
C
OI/FPD350–EN Rev. H
and check for
equally and
H
and stop
, ensuring the

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents