Mounting; General - ABB FPD350 Torbar Instructions Manual

Averaging pitot tubes
Table of Contents

Advertisement

FPD350 Torbar
Averaging pitot tubes

2.2 Mounting

2.2.1 General

Select a location with sufficient clearance to install and remove Torbar.
Referring to Fig. 2.1, install Torbar:
at right angles to the pipe run
across the pipe diameter
aligned with the pipe axis
Correct
(on diameter)
5
o
Flow
Fig. 2.2 Torbar Alignment
4
Incorrect
(not on diameter)
5
o
Ensure hole or thread
is within 5° of
perpendicular
2 Initial Installation
Horizontal Pipe
Vertical Pipe
OI/FPD350–EN Rev. H

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents