Threaded Models Fpd350.L6.E1 And Fpd350.L7.E1 - ABB FPD350 Torbar Instructions Manual

Averaging pitot tubes
Table of Contents

Advertisement

FPD350 Torbar
Averaging pitot tubes

2.13 Threaded Models FPD350.L6.E1 and FPD350.L7.E1

Warning. Threaded
models
FPD350.L7.E1 are designed for 'Hot-Tap' installation.
Observe all relevant safety precautions for drilling into
pressurized pipelines, and ensure the process material does
not exceed the Torbar's specified pressure and temperature
limits.
Install the Torbar as follows:
1. Select the required insertion position and mark the pipe.
2. Align the threaded fitting over the mark and tack-weld it in
place.
3. Using a suitably sized and threaded length of pipe, check
the threaded fitting is aligned correctly – see Fig. 2.2,
page 4.
4. Weld the threaded fitting to the pipe.
5. Referring to Fig. 2.12:
a. Apply suitable sealant to the close nipple
B
isolation valve
C
. Tighten securely.
b. Attach hot-tap drilling equipment to isolation valve
B
in
accordance
instructions.
c. Drill a 6 mm (0.24 in) pilot hole in the process pipe at
the marked position, then drill to the appropriate size
– see Table 2.7.
Torbar Model
Hole size in mm (in)
Table 2.7 Hole Size
d. Withdraw the drill, close isolation valve
remove the hot-tap drilling equipment.
e. Ensure 6 packing rings are located correctly inside
D
packing gland
14
FPD350.L6.E1
A
and fit them to the threaded fitting
with
the
manufacturer's
H601
H701
16 (0.63)
28 (1.1)
B
fully and
.
f. Ensure the drawbolt (or optional geared) retraction
and
assembly
g. Fit pressure chamber
gland
valve
necessary.
h. Insert the Torbar into packing gland
i.
Turn the Torbar until the indentation marks on the
head are positioned downstream of the flow – see
Fig. 2.1, page 3.
j.
Tighten the packing gland bolts
evenly until the packing gland is fully sealed,
ensuring the Torbar is able to slide through it.
k. Carefully open isolation valve
leaks around packing gland
Note. During step l, turn drive nuts
evenly to prevent binding.
and
l.
Drawbolt retraction assembly only – turn each
drive-nut
passes through isolation valve
opposite side of the process pipe. When the Torbar
is inserted fully, ensure the drawbolts
K
nuts
m. Drawbolt retraction assembly only – tighten lock
L
nuts
Note. The gear retraction handle is supplied loose
and can be fitted to either side of the gears.
However, ensure the handle is fitted so that the
Torbar is inserted when the handle is turned
clockwise.
n. Optional geared retraction assembly only – turn
the integral handle clockwise until the Torbar
contacts the opposite side of the process pipe.
o. Fully tighten packing gland bolts
Torbar does not turn. Check for leaks.
6. Check that the Torbar is installed correctly and aligned.
2 Initial Installation
E
is in the fully retracted position.
F
, complete with packing
D
and retraction assembly
B
, using appropriate sealants where
B
D
.
H
clockwise alternately until the Torbar
B
are in the positions shown.
.
OI/FPD350–EN Rev. H
E
, to isolation
D
.
G
equally and
and check for
H
equally and
and contacts the
J
and stop
G
, ensuring the