When unpacking the switch, check all components for any external
damage. Prior to installation, a functional check can also be carried
EN
out. For this, the instrument should be connected temporarily and the
glass prism dipped in and out of a glass of liquid to test it.
5.1 Mounting
Before installation, it must be ensured that the mounting hole
and the fixing device for the switches in the vessel are correct in
size and dimension.
Mount the switch, pressure-sealed, into the process
connection.
Following installation, the glass tip should have a distance of at
least 10 mm to the opposite wall. This minimum clearance can
vary dependent upon the geometry and surface finish of the wall.
Note: with electropolished pipes, the minimum distance to the
opposite surface must be a minimum of 20 mm.