5. Commissioning, operation

5. Commissioning, operation
When unpacking the switch, check all components for any external damage. Prior to
EN
installation, a functional check can also be carried out. For this, the instrument should be
connected temporarily and the glass prism dipped in and out of a glass of liquid to test it.
5.1 Mounting
Before installation, it must be ensured that the mounting hole and the fixing device for
the switches in the vessel are correct in size and dimension.
Mount the switch, pressure-sealed, into the process connection.
The glass tip must protrude into the vessel.
Following installation, the glass tip should have a distance of at least 10 mm to the
opposite wall. This minimum clearance can vary dependent upon the geometry and
surface finish of the wall. Note: With electropolished pipes, the minimum distance to the
opposite surface must be a minimum of 20 mm.
Mounting instructions (mounting position as required)
Horizontal installation
Vessel or pipe wall
Angled installation
10
Rubber or metal sealing
Fitting with sealing face
WIKA operating instructions models OLS-C01 ... OLS-C05, OLS-F1, OLS-5200
Vertical installation
Installation in elongated fitting
Elongated fitting
Insulation