Download Print this page
horsch LEEB LT Short Instruction

horsch LEEB LT Short Instruction

For filling and spraying variant eco, ccs and ccs pro
Hide thumbs Also See for LEEB LT:

Advertisement

Quick Links

Short Instruction for Filling LEEB LT and GS
1. Start the tractor
Set the diesel speed to approx. 1500 rpm.
¾
2. Open left side cover, connect suction hose
with filling connection and open filling valve.
The illustration
shows:
Leeb LT
Filling connection
3. On the external control terminal
Enter the filling limit
¾
Start filling
¾
The short instruction for the operation of the machine is only to be used with observation of the
safety and warning notes of the pertaining operating instructions. Compensation claims for dam-
ages due to non-observance of the operating instructions are excluded.
Art.: 80900223
Variant CCS Pro
Filling valve
Enter the filling
limit
Stop
Navigate up/down
Filling stops automatically when the desired
value has been reached. Interruption via the
stop button is possible at any time.
4. Close the filling valve, take off suction hose
and close side cover.
NOTE
Start filling
Confirm

Advertisement

loading
Need help?

Need help?

Do you have a question about the LEEB LT and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for horsch LEEB LT

  • Page 1 Short Instruction for Filling LEEB LT and GS Variant CCS Pro 1. Start the tractor Enter the filling Start filling limit Set the diesel speed to approx. 1500 rpm. ¾ 2. Open left side cover, connect suction hose with filling connection and open filling valve.
  • Page 2 Short Instruction for Filling LEEB LT and GS Variant CCS 1. Start the tractor 4. On the terminal Set the diesel speed to approx. 1500 rpm. Enter the filling limit ¾ ¾ Start filling ¾ 2. Open left side cover, connect suction hose Filling with filling connection and open filling valve.
  • Page 3 Short Instruction for Filling LEEB LT and GS Variant ECO 1. Open left side cover, connect suction hose 3. Start the tractor with filling connection and open filling valve. Turn on the PTO-shaft with approx. 540 rpm. ¾ 4. Observe the filling level of the solution tank...
  • Page 4 Short Instruction for Spraying LEEB LT and GS Variant ECO, CCS and CCS Pro 1. Filling the machine 6. Enter l/ha setpoint 2. Machines of the ECO and CCS variants: 7. Check the value “min. pressure” and “max. pres- Set the ball valve on the suction side to solu- sure”...

This manual is also suitable for:

Leeb gs