Cisco BWX 8415 Installation And Commissioning Manual page 4

Table of Contents

Advertisement

Contents
Pre-installation
5
C H A P T E R
Installation
6
C H A P T E R
BWX 8415 Basestation Installation and Commissioning Guide
iv
P R E L I M I N A R Y
4.4 Installation
4-4
4-5
5-1
5.1 Personnel and Tools
5.2 Project Plan
5-1
5.3 RF Coverage Prediction Map
5.4 Site Candidate Evaluation
5.5 Interference Analysis
5.6 Site Design and Regulatory
5.7 Network Architecture Plan
5.8 Fiber-optic Cable Selection
5.9 Bill of Materials (BoM)
5.10 Acquire Materials, Documents and Forms
5.11 Confirm AAA, BWG, and Backhaul Network Availability
5.12 Confirm FTP and BWX EMS Server Readiness
5.13 Confirm Mounting Location and Tower Crew Availability
5.13.1 Accessibility
5.14 Confirm Power and Grounding Readiness
5.14.1 Power Requirements
5.14.2 DC Power Cable Selection
5.14.3 Grounding Requirements
5.14.4 Lightning Protection
6-1
6.1 Inventory
6-1
6.2 BWX 8415 Basestation Radio Unit (RU) Installation
6-1
6.2.2 BWX 8415 Basestation Radio Unit Field Testing
6.2.3 Install the Radio Unit
6.3 BWX 8415 Installation
6.3.1 Description
6-6
6.3.2 Install the GPS Antenna Cable
6.3.3 Handling the BWX 8415 Basestation
6.3.4 Mounting the BWX 8415 Basestation
6.3.5 Antenna Separation
6.3.6 Rooftop Antenna Placement Tool
5-1
5-1
5-2
5-2
5-2
5-2
5-3
5-3
5-3
5-4
5-4
5-4
5-4
5-5
5-6
5-6
6-4
6-6
6-7
6-8
6-9
6-12
6-17
5-3
5-4
6-1
6-3
OL-19519-01

Advertisement

Table of Contents
loading

Table of Contents