Preparations For Inspection And Maintenance - Hitachi Zaxis 33U-5A Operator's Manual

Hydraulic excavator
Table of Contents

Advertisement

Preparations for Inspection and Maintenance

Except in special cases, park the machine by following the
procedure before servicing the machine.
1. Park the machine on a level surface.
2. Lower the bucket and the blade to the ground.
3. Turn the auto-idle switch OFF.
4. Turn engine control dial to the slow idle position and run
the engine for 5 minutes to cool the engine.
5. Turn the key switch OFF to stop the engine. Remove the
key.
6. Pull pilot control shut-off lever (1) to the LOCK position.
7. After putting a tag for "Under Serving" on the easy-to-
see cab door or control lever, begin the work.
d
WARNING: Never attempt to maintain the machine
when the engine is running in order to prevent the
accident. If maintenance work while engine running is
unavoidable, strictly comply with the following items.
 One person should take the operator's seat
to be ready to stop the engine any time while
communicating with other workers.
 When working around moving parts is unavoidable,
pay special attention to ensure that hands, feet, and
clothing do not become entangled.
 If parts or tools are dropped or inserted into the fan
or the belt, they may fly off or be cut off. Do not drop
or insert parts and tools into the moving parts.
 Move pilot control shut-off lever (1) to LOCK position
so that the front attachment will not move.
 Never touch the control levers and pedals.
If operating the control levers or pedals is
unavoidable, signal co-workers to evacuate to safer
place.
MAINTENANCE
7-7
M1M7-05-024
1
MADB-07-001
SA-2294
SA-026

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zaxis 38u-5aZaxis 65usb-5aZaxis 48u-5aZaxis 55u-5a

Table of Contents