Advertisement

Pecan Engineering Pty Limited proudly supports the activities of Landcare Australia through its membership of the AHHA
Installation Instructions
Contemporary and Stylish
B600
B900
B605
B905

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the B600 and is the answer not in the manual?

Questions and answers

Summary of Contents for Blaze B600

  • Page 1 Installation Instructions Contemporary and Stylish B600 B900 B605 B905 Pecan Engineering Pty Limited proudly supports the activities of Landcare Australia through its membership of the AHHA...
  • Page 2: Table Of Contents

    Check local building regulations before installing the appliance. INSTALLING THE FIREBRICKS ……………………….. 8 All Blaze wood heaters have been tested to ensure that they RELOCATING THE FAN ASSEMBLY ………………… 8 will meet the appropriate safety Standard requirements if the 10.0...
  • Page 3: Assembling The Heater

    3. INSTALLING THE HEATER 2. ASSEMBLING THE HEATER This Blaze heater will arrive in two parts, the firebox body and Positioning the Heater the base unit representing the B600/B900 or the B605/B905. First review the necessary minimum clearances specified B600 / B900 below before considering where to position the heater.
  • Page 4 3.1.3 B605 & B905 – Standard Installation (Middle) Model Note: B605 & B905 models have the same rear, side, and B605 front clearances relative to the firebox body as the B600 & (rear flue shield) B900. B605 (decro-mesh) Combustible Wall...
  • Page 5 3.1.5 Combustible Wall Combustible Wall B605 / B905 – Standard Install (Left) – minimum clearances Model B600 / B900 - Corner Installation - minimum clearances B605 (rear flue shield) Model B605 (decro-mesh) B605 (rear flue shield) B905 (rear flue shield)
  • Page 6: Reducing Clearances To Combustibles

    For example: Decro-mesh Side wall clearance for the B600 C is 425 mm. A 12mm gapped shield on the wall with a factor of 0.40. Inner reflector Calculate: - 425 mm x 0.40 = 170 mm. This is the new side wall minimum clearance.
  • Page 7: Installing The Baffle Plate

     Depending on the supplier, decro-mesh can be one of 6. INSTALLING THE BAFFLE PLATE three sizes – 200 mm, 7 ¾ inch, or 8 inch diameter. The decro-mesh ring will fit the two smaller diameters but The baffle plate should be installed before installing the fire not the 8 inch.
  • Page 8: Installing The Ash Plate

    2) Slide the fan across to the relevant side beneath the firebox body and refit the M12 screw in the new B600 & B605 – Brick Layout location (note, depending on which side, this may require moving the controller unit first).
  • Page 9: Relocating The Blanking Plates

    11. INSTALLING THE GLASS PANELS The B605 & B905 has two blanking plates which sole purpose B600 & B900 – Glass Location is to block out a sliver light that can be seen between the 1) Place glass inset 3mm from each side of the base.
  • Page 10: Technical Drawings

    Model – B605 Middle (default) 12. TECHNICAL DRAWINGS Model – B600 Model – B605 Left Model – B900 Model – B605 Right...
  • Page 11 Model – B905 Middle (default) Model – B905 Left Model – B905 Right...

This manual is also suitable for:

B900B605B905

Table of Contents