Maytag MHN33PDCWW Installation Instructions Manual page 25

Commercial stacked washer/ dryer gas or electric
Table of Contents

Advertisement

Available languages

Available languages

Connecting 3-Wire Connection: Power Supply Cord
Standard Power Cord Connectors
Flanged spade connector
Connecting Neutral Wire
1. Loosen or remove center terminal block screw.
Connecting 4-Wire Connection: Direct Wire
IMPORTANT: A 4-wire connection is required for mobile homes
and where local codes do not permit the use of 3-wire connections.
Direct wire cable must have 5 ft. (1.52 m) of extra length so dryer
can be moved if needed.
Strip 5" (127 mm) of outer covering from end of cable, leaving
bare ground wire at 5" (127 mm). Cut 1
remaining wires. Strip insulation back 1" (25 mm). Shape ends
of wires into a hook shape.
ELECTRIC DRYER ELECTRICAL CONNECTIONS
Ring Connector
" (38 mm) from three
1
2
2. Connect neutral wire to center terminal block.
3. Connect remaining wires with outer terminal block screws.
Connecting Ground and Neutral Wires
1. Remove center terminal block screw and the ground wire
by removing the external ground connector screw.
25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mhn33pdcxwMhn33pdcgwMhn33prcwwMhn33pncgw

Table of Contents