Storage Requirements - Trane CVHH CenTraVac Installation, Operation And Maintenance Manual

Water-cooled chillers with tracer adaptiview control
Table of Contents

Advertisement

P P r r e e - - I I n n s s t t a a l l l l a a t t i i o o n n
Trane Supplied
Type of Requirement
Trane Installed
Water piping
Relief
Insulation
Water Piping Connection
Flanged (optional)
Components
Other Materials
"Appendix B: CenTraVac™
Chiller Installation
Completion and Request
for Trane Service," p. 119
(CTV-ADF001*-EN; refer
to
"Appendix A: Forms and
Check Sheets," p.
118)
Chiller start-up
commissioning
(a)
Post-commissioning
transport of empty
refrigerant containers for
return or recycling
(a)
Start-up must be performed by Trane or an agent of Trane specifically authorized to perform start-up and warranty of Trane® products. Contractor shall
provide Trane (or an agent of Trane specifically authorized to perform start-up) with notice of the scheduled start-up at least two weeks prior to the
scheduled start-up.

Storage Requirements

N N O O T T I I C C E E
I I n n s s u u l l a a t t i i o o n n D D a a m m a a g g e e ! !
F F a a i i l l u u r r e e t t o o f f o o l l l l o o w w t t h h e e s s e e i i n n s s t t r r u u c c t t i i o o n n s s c c o o u u l l d d r r e e s s u u l l t t i i n n
i i n n s s u u l l a a t t i i o o n n d d a a m m a a g g e e . .
T T o o p p r r e e v v e e n n t t d d a a m m a a g g e e t t o o f f a a c c t t o o r r y y i i n n s s t t a a l l l l e e d d i i n n s s u u l l a a t t i i o o n n : :
• •
D D o o n n o o t t a a l l l l o o w w t t h h e e i i n n s s u u l l a a t t i i o o n n t t o o b b e e e e x x p p o o s s e e d d t t o o
e e x x c c e e s s s s i i v v e e s s u u n n l l i i g g h h t t . . S S t t o o r r e e i i n n d d o o o o r r s s o o r r c c o o v v e e r r w w i i t t h h
c c a a n n v v a a s s t t o o p p r r e e v v e e n n t t e e x x p p o o s s u u r r e e . .
• •
D D o o n n o o t t u u s s e e t t h h i i n n n n e e r r s s a a n n d d s s o o l l v v e e n n t t s s o o r r o o t t h h e e r r t t y y p p e e s s
o o f f p p a a i i n n t t . . U U s s e e o o n n l l y y w w a a t t e e r r b b a a s s e e l l a a t t e e x x . .
14
Trane Supplied
Field Installed
Rupture disk assembly
RuptureGuard™
(optional)
Insulation (optional)
Flanged (optional)
Trane, or an agent of
Trane specifically
authorized to perform
start-up of Trane®
products
Field Supplied
Field Installed
Taps for flow sensing devices
Taps for thermometers and gauges
Thermometers
Strainers (as required)
Flow sensing devices
Water flow pressure gauges
(may be field supplied)
Isolation and balancing valves in water piping
Vents and drain on waterbox valves (one each per
pass)
Pressure relief valves (for waterboxes as required)
Vent line and flexible connector and vent line from
rupture disk to atmosphere
Insulation
Chiller feet insulation
Victaulic®
Victaulic® to flange
Victaulic® coupling for 150 psig (1034.2 kPaG) and
adapter for 150 psig
300 psig (2068.4 kPaG) waterboxes
(1034.2 kPaG)
Fasteners for flanged-type connections (optional)
waterboxes
Material and equipment to perform leak testing
Dry nitrogen (8 psig [55.2 kPaG] maximum per
machine as needed)
To be completed by installing contractor prior to
contacting Trane for start-up
Move empty refrigerant containers to an easily
accessible point of loading
CVHH-SVX001G-EN

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Centravac cvhh

Table of Contents