INSTALLATION PROCEDURE — LARGE COVER
1. Determine the installation location of
the studs and water supply pipe
relative to the position of the
toilet/urinal.
2. If needed, slide a thread solder
adapter on the water supply pipe.
3. Attach the control stop to the pipe.
4. Bore a guide hole for the flush pipe
into the wall.
NOTE:
Attach the control stop
before installing the box
fixing frame. Thread sealing
compounds should only be
used on the male NPT
threads only.
NOTE: For reclaimed water, do not use
standard vacuum breaker or
control stop.
NOTE: Do not use petroleum based products
or pipe sealants.
For use with a left water supply,
detach the controller and remount it
to opposite side of valve body.
Protect the wire connections
inside the controller's case.
5. Fasten the base frame to the studs with
four screws (prepared on site) after
adjusting it. ( A )
6. Secure the box with four screws in the
adjustable plate. ( B )
Left water supply
1" NPT (toilet), 3/4" (urinal)
Sensor location
3-7/16" (87mm)
** 13-1/2"
Stud
* 14-3/4" ‡
(343mm)
Toilet top spud
from top of
Ø2-3/16" (Ø56mm) hole
Urinal top spud
Ø1-1/2" (Ø38mm) hole
Toilet back spud
Ø2-3/16" (ø56mm) hole
Urinal back spud
Ø1-5/16" (ø33mm) hole
* X", ‡ = At least 5" clearance from sensor to tip of toilet seat up position or
to top of grab bar is required to avoid false detection.
** Opening in wall
Detatch
Base frame
Adjustable hole
Adjustable hole
7
4-3/4" ± 1/2"
Right water supply
(120 ± 13mm)
1" NPT (toilet),3/4" (urinal)
CL of sensor
* X"
Valve body
Remount
Adjustable
plate