Adjustment Methods - A.O. Smith LILY User Manual

Reverse osmosis
Table of Contents

Advertisement

Available languages

Available languages

• Installation of UV Lamp:
Stain Steel
First be sure that the water inlet and electricity connections are cut off from
Tube Assembly
the unit. Open the front cover, remove the UV lamp protector, and take
out the UV lamp and 2 pin cables from package, put one end 2 pins of UV
lamp into the hole end of cable connector, then put another end 2 pins of
inking machine fixation
UV lamp and 2 pins plug of cable together into the 4 holes end connector
drinking machine is not wall hung type, and need put on the ground or solid flat surface directly. If choice to hung on the wall, need to purchase
and tight. Then install the cables and UV lamp into the stain steel tube
ional expand bolts and screws for fixation.
assembly, and make sure the 4 holes connector also inside, then cover the
end with cap and fix the cover (See Diagram 11).
orage tank installation
p 4-5 rounds thread seal tape on the tank nozzle, then fix the tank valve into the tank nozzle, then cut
suitable length 1/4" tube, put one end of tube on the tank valve, and another end connected to the
nk" joint of the unit (see diagram 12). After that, find a suitable place to locate the tank in the cabinet.

Adjustment Methods

r supply is used and water supply is suitable.
Make sure that the water route connections are correct, proper power supply is used and water supply is suitable.
Then, follow these steps to adjust the purifier:
Wait until the machine is operating properly, then close the inlet water
G 14
• Open the tap water inlet valve and the water purifier inlet water ball
ball valve. After a short period of time, check to see if the machine stops
valve (See Diagram 13) and plug the unit in the power outlet. Close
working, if it does not stop working, check to see whether or not
the storage tank ball valve, then automatically start a 120 second
the low-pressure switch can be reset.
flushing process, water will start to drain through the discharge outlet.
Perform a second check to make sure everything is ok. Now your water
f
o low
lly.
ENG 14
Diagram 11
Diagram 11
3-Way Joint
Close
Open
Diagram 13
Diagram 13
• RO Unit Placement:
Lily RO unit is not wall hung type, and need put on the ground or solid flat
UV Lamp
surface directly. If choice to hung on the wall, need to purchase additional
expand bolts and screws for fixation.
• Installation of the Storage Tank:
Wrap 4-5 rounds thread seal tape on the tank nozzle, then fix the tank
valve into the tank nozzle, then cut out a suitable length 1/4" tube, put one
end of tube on the tank valve, and another end connected to the "Tank"
joint of the unit (See Diagram 12). After that, find a suitable place to locate
the tank in the cabinet.
• Wait for the water purifier to operate stably (for about 5-10 minutes).
Check each connection to make sure they are secure. Check to see if
there is any leakage from the membrane shell, filters, etc.
• Close the pure water osmosis faucet and storage tank ball valve. Wait
approximately 30 seconds. Check to see whether or not the water
purifier waste water and high pressure pump have stopped working.
• Open the osmosis faucet. Check to see if the water is flowing through
the faucet. If not, check to see whether the tap water pressure is too low
or whether or not the high pressure switch can be reset automatically.
• Wait until the machine is operating properly, then close the inlet water
ball valve. After a short period of time, check to see if the machine stops
working, if it does not stop working, check to see whether or not
the low-pressure switch can be reset.
• Perform a second check to make sure everything is ok. Now your water
purifier is ready for use.
Tank Valve
Nozzle
1/4"
Tube
Tank
Base
Diagram 12
Diagram 12

Advertisement

Table of Contents
loading

Table of Contents