3- Maintenance And Pre-Installation Notes - Facnor LS PLUS Installation Manual

Torlon balls, reefing & furling systems, race developed technology
Table of Contents

Advertisement

Available languages

Available languages

3- MAINTENANCE AND PRE-INSTALLATION NOTES

3.1 GENERAL REMARKS WITH REGARD TO FACNOR FURLING SYSTEM:
Simple to assemble: no mast unstepping, no section cutting, no drilling
The FACNOR headsail furling system is one of the easiest to install:
- it does not require unstepping the mast
- under most circumstances you will not need to cut any section on account of the
patented Facnor telescopic section.
- no drilling is necessary.
Easy maintenance : rinsing
The
LS+/LX+/RX+
require any specific maintenance as the drum
and the swivel are fitted with Torlon
(identification sticker see against).
Rinse the furling system several times each season.
Because of corrosive salt deposits it is necessary to prevent from salt accumulation by
regularly cleaning the mechanisms with fresh water in order to guarantee a long life to your
equipment.
F a c n o r - I n s t a l l a t i o n m a n u a l r e v 2 0 1 2 – L S + / L X + / R X + r e e f i n g a n d f u r l i n g s y s t e m s
furling
systems
do not
®
bearings
hole in the
drum specially
designed for
rinsing
English
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lx plusRx plus

Table of Contents