14. COMPONENTS ENGINEERING TA-10 SETUP
13.

COMPONENT ENGINNERING TA-10 SETUP

The Component Engineering TA-10 can be used for theater automation with the SR-1000. It
requires that the TA-10 be wired in a particular configuration. A wiring diagram can be seen in
Figure 44.
The TA-10 is connected to the SR-1000 using the server's GPIO input/output port. Configure
event labels with the GPIO device to trigger the TA-10.
14.
TESTING PROCEDURES FOR QC AFTER
INSTALLATION
After the installation has been completed, it is necessary to test the following to ensure that the
SR-1000 has been properly installed:
1. Test the video playback capabilities of the SR-1000.
2. Test the audio playback capabilities of the SR-1000 and verify that all the channels are
working. Also check for any static noises.
3. Test the server's ability to activate automation cues using test cues for lights, curtains,
sound and fire alarm.
4. Test the remote access capabilities of the server, including: Theater Management
System (TMS) access and network connectivity.
Installation Manual for SR-1000 Standalone Integrated Media Block™
Figure 44 Component Engineering TA-10 wiring diagram.
- 39 -