J Mj-Xl Jumpers And Battery Replacement; Mj-Xl Jumpers - Siemens MJ-XL Installation And Operation Manual

Voltage regulator control panel
Hide thumbs Also See for MJ-XL:
Table of Contents

Advertisement

:
Appendix J
MJ-XL Jumpers and Battery Replacement
L
J MJ-X
Jumpers and Battery Replacement
L
J.1
MJ-X
Jumpers
L
The locations of the MJ-X
jumpers and the default settings.
2
1
JP9
No Jumpers
(Default)
L
MJ-X
Jumpers
Figure J.1
70
jumpers and battery are shown in the drawing below. The table on the next page describes the
SIEMENS MJX
1
2
J2
Pins 1 & 2 Jumpered
(Default)
J1
1
2
J1
1
2
Jumpered for DCE
Jumpered for DTE
(Default)
1
1
2
2
3
3
J23
J22
1
2
3
J23
Battery (BT1)
Pins 1 & 2 Jumpered
(Default)
2
1
J9
Siemens Power Transmission & Distribution, Inc.
1
1
2
2
3
3
J23
J22
1
2
3
J22
2
1
J9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents