Download Print this page

Installation Guide - Sealy Ease Owner's Manual

Advertisement

Available languages

Available languages

installation guide

STEP 1
Place the bed base box in a desired location with the bottom of the box
facing up.
Remove the binding straps and packing materials, making sure not to
puncture the box with any sharp objects.
STEP 2*
Remove the bed base from the box keeping the bottom of the base
facing upwards.
*If installing a King/Cal King base please refer to page 8
STEP 3
To install Headboard Brackets (sold separately)
see instructions on page 14.
Legs are shipped fully assembled. Alternative heights in 3"
increments can be achieved by removing leg segments.
To install the legs, thread the washer over the bolt of the leg with
the recessed side facing the leg, and tighten by hand. Do not over
tighten.
For customer support, call Customer Service: U.S. 1-800-499-1965 | Canada 1-800-268-4414
6
Always use two people when setting up the base.
STEP 4
To sync two bases see detailed installation
instructions on pages 12-13.
Locate the Backup Battery Box and install (2) 9 Volt batteries
(not included).
STEP 5
Uncoil input Power Cord (connected to Control
Box's power port) and plug into Power Supply.
STEP 6
Uncoil the Power Cord and connect to the
Power Supply. Place Power Supply on the
ground and extend from the base. Ensure that
the Power Supply and all attached cords are
directed toward the desired surge protector.

Hide quick links:

Advertisement

loading