Boiler Assembly

CAUTION:
The work area must be well
ventilated during boiler assembly .
WARNING: Keep Buderus Haftgrund 181 primer
away from flam e ! Do not smoke
during assembl y ! Do not pour
Buderus Haftgrund 181 primer down
open drain s !
File off any burrs from the nipple ports (Fig. 8).
Clean the sealing surfaces of the nipple ports with
a rag soaked in thinner or gasoline. Wipe dry.
Evenly coat the nipple port sealing surfaces with
the orange sealing compound (Leinolmennige)
using the brush provided (Fig. 9).
Clean the sealing grooves for sealing the flue side
of the boiler using a steel wire brush. Make sure
surfaces are dry, clean and free of any oily residues.
Apply the Buderus Haftgrund Primer 181 to all
sealing grooves using a small paint brush (Fig. 10).
The sealing of the flueway of each section is
achieved with the sealing cord. The sealing
cord can be installed 5 to 15 minutes after
the application of the primer.
Fig. 8
Fig. 9
Fig. 10
6
Coat with
orange sealing
compound
Sealing grooves
9