Boiler Assembly
CAUTION:
The work area must be well
ventilated during boiler assembly .
WARNING: Keep Buderus Haftgrund 181 primer
away from flam e ! Do not smoke
during assembl y ! Do not pour
Buderus Haftgrund 181 primer down
open drain s !
•
File off any burrs from the nipple ports (Fig. 8).
•
Clean the sealing surfaces of the nipple ports with
a rag soaked in thinner or gasoline. Wipe dry.
•
Evenly coat the nipple port sealing surfaces with
the orange sealing compound (Leinolmennige)
using the brush provided (Fig. 9).
•
Clean the sealing grooves for sealing the flue side
of the boiler using a steel wire brush. Make sure
surfaces are dry, clean and free of any oily residues.
•
Apply the Buderus Haftgrund Primer 181 to all
sealing grooves using a small paint brush (Fig. 10).
•
The sealing of the flueway of each section is
achieved with the sealing cord. The sealing
cord can be installed 5 to 15 minutes after
the application of the primer.
Fig. 8
Fig. 9
Fig. 10
6
Coat with
orange sealing
compound
Sealing grooves
9