Introduction; Unpacking Instructions; Mvme712-10 Module Preparation - Motorola MVME712-10 User Manual

Transition module
Hide thumbs Also See for MVME712-10:
Table of Contents

Advertisement

HARDWARE PREPARATION AND
INSTALLATION INSTRUCTIONS

Introduction

This chapter provides unpacking instructions, hardware preparation, and
installation instructions for the MVME712-10 Transition Module.

Unpacking Instructions

N
If the carton is damaged upon receipt, request that carrier's
ote
agent be present during unpacking and inspection of the
equipment.
Unpack the equipment from the shipping carton. Refer to the packing list and
verify that all items are present. Save the packing material for storing and
reshipping of the equipment.

MVME712-10 Module Preparation

The location of the connectors on the MVME712-10 is illustrated in Figure 2-1.
The module has been factory tested and is configured for DTE, but can be
operated as DCE with an appropriate external adapter if desired. The
connectors are:
Four RJ45 EIA-232-D serial ports with DTE configuration (J1, J2, J3, J4)
SCSI converter connectors (J5, J6, J7)
Printer/parallel connector (J8)
I/O connector (J9)
Ethernet connector (J10)
MVME712-10/D12-1
2

Advertisement

Table of Contents
loading

Table of Contents