Summary General information Technical information Installation Characteristics and electrical connections Control of the IDEO Commissioning of the IDEO Change of the communication channel Access to error menu Before manipulating this device, switch off the unit. During normal working, never stop the ventilation system.
1- General information High-performance heat recovery dwelling unit 1.1 - Introduction This manual is destined for use with the IDEO 325 Ecowatt high-performance heat recovery unit and its peripheral fittings (conduits, inlets, regulators…). Its aim is to provide the maximum information and safety during installation, set-up and use. As our products are in constant development, Soler &...
2 – Technical information 2.1 - General definition The IDEO 325 Ecowatt provides optimum ventilation for a room with a maximum energy recover. It extracts air from spaces such as (Bathroom/s, WC, kitchen and washroom/s or shower room/s, and supplies fresh air into the main rooms (Living rooms, bedroom/s, office, …). The fresh and extracted flows are separated and filtered.
Page 5
New fresh air inlet : On this spigot is connected to the outside air inlet. Be sure to position the fresh air intake (wall or roof) at a sufficient distance from any area with high pollution (Tree, rejection combustor, road, ...). This duct should be thermally insulated and sealed to prevent condensation on the outside and inside the duct.
Page 6
2.3 - Dimensional characteristics: 2.3.a – Central unit Weight: 51 Kg: 2.3.b – Remote controls: Programmable module Boost...
Wall bracket 3 - Installation 3.1 - On a vertical wall: Insulated Uninsulated Insulated duct duct duct Ducts should be insulated and fitted perfectly. 3.2 - On the floor: It is recommended to locate IDEO in heated house space. Otherwise it will be necessary to insulate the condensate drain.
Page 9
EXAMPLE OF FITTING “SPLIT” TYPE CPR or CT Kitchen BDO or BOAP BDO or TPM Toilets Plenum 7 spigots Air intake PAQS150 Air intake D150 Living room & Bedrooms PAF 150 Plenum 4 or 8 spigots Aire intake roof D150 In the case of use of flexible duct insulated, it is...
Page 10
EXAMPLE OF FITTING “DISTRIBUTE” TYPE CT 150 Living room BDOP 125 Kitchen BDOP 125 BDOP D80 RD80 Bedrooms Toilets BDOP D80 RD80 Air intake D150 In the case of use of flexible duct insulated, it is Air intake imperative to PAQS150 stretch it.
4 - Characteristics and electrical connections Connecting the cable to the network through a sealed connection box. Electrical panel Wire H05VV-F-5G1 Length 1.2 m Connection box Power supply : Single phase 230-50Hz Electrical protection: Maximum power: 230 W Max. ambient temperature: 50ºC Max.
5 – Control of the IDEO-HR The IDEO-HR can be controlled from: • A button that enables the boost airflow for the kitchen to be timed in ½-hour steps. It is possible to control the central IDEO-HR several push buttons. The life of the battery for normal use (3 times per day on average) is estimated to be 3 years.
Page 13
5.1 . Description of the programming module: 1 – Adjustment mode using the clock 2 – Programming mode (Auto 1 – Auto 2 – Manual) 3 – Day of the week 4 – Programming period 5 – Ventilation speed (small or large flow) 6 –...
Page 14
5.2 . Functions of the programming module: (1) • On/Off mode: If you decide to use the product with the On/Off mode you must first adjust it. (according to the regulation by each country). To enable this feature, before activate the batteries, open the box of the remote control and put the four micro switches on the “ON”...
Page 15
• Choice of programming (2): There are 4 ways to pass the "minimum airflow" to "maximum airflow“ • 2 preprogrammed (AUTO 1 and AUTO 2) • 1 programmable manual (MANU) • Boost (timed button). • Selection and validation of the programs "automatic": Auto 1 : Working week with two meals per day, three in the weekend, but starting breakfast two hours later.
Page 16
Example of programming: DAY 1 (Monday): T1: start 6:30h- end 7:30h T2: no programming T3: start 19:30h pm - end 20:30 p.m. Navigate with the arrow keys until 19 or 20 until pictogram 2. Select "Man." Confirm by pressing 18. Confirm by pressing again the button 18.
Page 17
• Activation of absence mode (8): During a period of prolonged absence, you can reduce the airflow of ventilation (Half mini airflow). To do this, navigate with the buttons 19 or 20 until 8 mode pictogram absence. Select with key 18. The icon flashes. Confirm with 18. •...
6 – Commissioning of the IDEO In order to commissioning your installation, it is necessary to follow the following process: 1. Check that all the installation components are in their proper place and connected: • Air intake make with insulated duct and properly connected (do not use air intake fitted with protection guard), •...
Page 19
6.1 - Access to installation menu Accessing to this menu allows to check and adjust the IDEO's parameters of each installation. To access to the menu 3 seconds (1) – Left scroll key (-) (2) – Right scroll key (+) (3) –...
– Change of the communication channel 7.1 - On the programming module (15 channels - 4 micro-switches and 64 channels - 6 micro- switches). CHAn 3 seconds 7.2 - On the boost (see coding on following page). Remove the battery. 7.3 - On the central module: Before taking any action, switch off the unit.
7.4 – Code switch setting 0-64 channels model: 8- Access to error menu Access to this menu allows to know the type of error. Attention! This menu may only be accessed when the spanner icon is present. To access to the menu 3 seconds (1) –...
Need help?
Do you have a question about the IDEO2 325 Ecowatt and is the answer not in the manual?
Questions and answers