General Instructions; Basic Requirements For On-Site Preparation; Frequency Inverters; General Dimensions - Netafim NMC-PRO Installation Manual

Hide thumbs Also See for NMC-PRO:
Table of Contents

Advertisement

GENERAL INSTRUCTIONS

1 GENERAL INSTRUCTIONS
• Installation should be performed by authorized technicians only.
• Verify that field components are working properly.
• Apply all safety regulations.
• Do not apply force or pressure on components during the installation procedure.
• Refer to your supervisor if problems occur during installation procedure.

1.1 Basic Requirements for On-Site Preparation

• Verify power source between 115 VAC or 220 VAC or 12VDC. (Australia & New Zealand 240 VAC±5%).
• Verify grounding connection < 10Ω.
• Environment temperature between (-10° C / 14° F)-(+60° C / 140° F).
• Verify protection from damaging climate conditions.

1.2 Frequency Inverters

Frequency inverters can cause severe electrical and electromagnetic interference. Therefore, when employing a
frequency inverter, it is critical that you carefully follow the manufacturer's installation instructions.
In particular verify:
• that the cable shielding between the inverter and any motor meets industry standards
• proper grounding of the inverter's chassis and motor power cable
• proper grounding of low voltage cable shield wire
• that the controller and inverter cables are kept in separate conduits or wire bundles

1.3 General Dimensions

NMC-PRO Installation Manual
Page
9

Advertisement

Table of Contents
loading

Table of Contents