MOUNTING / ANCHORING THE
HEAT RECOVERY UNIT(S)
Mounting / Anchoring the Heat Recovery Unit(s)
Install the heat recovery unit by suspending it from the ceiling with
the top (see diagram) always facing up.
1. Using a drop-in anchor, install the hanging bolt.
2. Thread 3/8 or 5/16 inch hexagon nuts (field-supplied), the metal
hanger tabs, and flat washers (field-supplied) onto the hanging
bolts as shown in the diagram.
3. After verifying that the heat recovery unit is level, tighten the
hexagon nuts.
• The heat recovery unit should be positioned no more than ±5° from
level front to back and left to right.
• Removing the factory process stubs is recommended. Replace with
refrigerant-grade caps.
• Insulate unused ports completely as shown in the figure.
40
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
Heat Recovery Unit Installation.
Insulation
Hexagon Nut
(3/8" or 5/16")
Metal Hanger Tab
Hanger metal
Flat washer (3/8")
Flat washe
Hexagon Nut
(3/8" or 5/16")
Hanging bolt
Hanging bolt
(3/8" or 5/16")
4
Top
2
1
3