Download Print this page

S.R.Smith TYPHOON Assembly And Installation Instructions Manual page 14

Advertisement

INSTALLED TYPHOON STRUCTURAL & INSTALLATION CHECKLIST
1.
Inspect the runway for visible cracks or tears.
2. Inspect the slide for sharp edges, protrusions, cracks or tears.
3. Inspect all fasteners to make sure they are fully tightened.
4. Inspect the ladder for rigidity and attachment.
5. Measure the following dimensions and compare with the Manufacturer's Placement Instructions
on pages 12 and 13.
Measure the depth of water in front of the slide exit. (4'-6" min. depth at a distance of 4'-
6" from exit end of slide.)
Measure the height of the slide runway exit above the water. (20" max.)
Measure the distance between the slide centerline and the edge of other pool equipment.
6. Observe the position of the exit of the slide as shown in FIG.'S 13, 14 and 16 on pages 12 and
13.
PERSONALLY GIVE TO SLIDE OWNER THE TYPHOON OWNER'S MANUAL,
THE WARRANTY CARD AND ANSWER ALL QUESTIONS.
IMPORTANT
14

Advertisement

loading