Table Of Contents; Job Specification Sheet - Pentair FLECK 2815 Service Manual

Water softener or filter control valve
Table of Contents

Advertisement

TABLE OF CONTENTS

JOB SPECIFICATION SHEET .................................................... 2
OPERATING PARAMETERS ...................................................... 3
INSTALLATION ......................................................................... 4
(ELECTROMECHANICAL TIMER ONLY) ................................... 5
3200 TIMER SETTING PROCEDURE ........................................ 6
3210 TIMER SETTING PROCEDURE ........................................ 7
3200 TIME CLOCK TIMER ASSEMBLY...................................... 9
3210 METER DELAYED TIMER ASSEMBLY .............................. 10
SXT TIMER ASSEMBLY ............................................................. 11
XTR2 TIMER ASSEMBLY .......................................................... 12
2815 SXT CONTROL VALVE ASSEMBLY ................................... 13
2815 XTR2 CONTROL VALVE ASSEMBLY ................................. 13
2815 VALVE ACCESSORIES ...................................................... 14
2815 VALVE ASSEMBLIES ........................................................ 15
2815 CONTROL VALVE ASSEMBLY .......................................... 16
DLFC INSERT OPTIONS ........................................................... 18
FILTER CONVERSION KIT ........................................................ 18
KIT, WIRE HARNESS, DC ......................................................... 18
1720 BRINE SYSTEM ASSEMBLY ............................................. 19
2310 SAFETY BRINE VALVE ..................................................... 21
2350 SAFETY BRINE VALVE ..................................................... 22
TROUBLESHOOTING ................................................................ 23
WATER CONDITIONER FLOW DIAGRAMS ............................... 24
FLOW DATA & INJECTOR DRAW RATES .................................. 25
DIMENSIONS............................................................................ 28
SYSTEM #4 .............................................................................. 31
SYSTEM #5 INTERLOCK ......................................................... 31
SYSTEM #6 .............................................................................. 32
SYSTEM #7 ............................................................................... 32
WIRING ..................................................................................... 33
REPLACEMENT ........................................................................ 36
BRINE ASSEMBLY REPLACEMENT ......................................... 36
INJECTOR REPLACEMENT ...................................................... 37
TIMER REPLACEMENT ............................................................ 37
MOTOR DRIVE ASSEMBLY REPLACEMENT ............................ 37
DLFC REPLACEMENT .............................................................. 37
2 • FLECK
2815 Control Valve Service Manual

JOB SPECIFICATION SHEET

Job Number: ______________________________________________
Model Number: ____________________________________________
Water Hardness: _________________________________ppm or gpg
Capacity Per Unit: __________________________________________
Mineral Tank Size (Height x Diameter): _________________________
Salt Setting per Regeneration: ________________________________
1. Type of Timer:
A. 7 Day or 12 Day
B. Meter Initiated
2. Regenerant Flow Direction:
3. Meter Size:
A. 1-1/2 inch Std Range (625 - 10,625 gallon setting)
B. 1-1/2 inch Ext Range (3,125 - 53,125 gallon setting)
C. Electronic ____Pulse Count ___ Meter Size ____________
4. System Type:
A. System #4: 1 Tank, 1 Meter, Immediate, or Delayed Regen-
eration
B. System #4: Time Clock
C. System #4: Twin Tank
D. System #5: 2-4 Tanks, Interlock Electronic Meter per unit
E. System #6: 2-4 Tanks, 1 Meter, Series Regeneration,
Electronic
F. System #7: 2 Tanks only, 1 Meter, Alternating Regeneration
5. Timer Program Settings:
A. Backwash:
B. Brine and Slow Rinse:
C. Rapid Rinse:
D. Brine Tank Refill:
E. Pause Time:
F. Second Backwash: Minutes
6. Drain Line Flow Control: ________ gpm
7. Brine Line Flow Controller: ________ gpm
8. Injector Size Number: ________
9. Piston Type:
A. Hard Water Bypass
B. No Hard Water Bypass
California Proposition 65 Warning
This product contains chemicals known to
WARNING:
the State of California to cause cancer or
birth defects or other reproductive harm.
Downflow
Minutes
Minutes
Minutes
Minutes
Minutes

Advertisement

Table of Contents
loading

Table of Contents