CONTROL TEST PROCEDURE

6 CONTROLLER TEST PROCEDURE

The Test menu provides a quick way of verifying functionality.
• Relays, page 32
• Digital Input, page 32
• Analog Input, page 33
• Temperature, page 34
• Humidity, page 34

6.1 Relays

The Relays Test screen allows you to check the current output status and verify proper operation.
The setting switches automatically between ON and Off depending on device actual status.
To manually test relay functionality, move the cursor to required device using the arrow keys and press ENTER; the
device is turned on and the setting shows MAN.
Press ENTER again to return to automatic operation.
• OFF: The output is not active.
• ON: The output is automatically turned on by the relevant program.
• Man: Manual operation of the output. The manual operation resets after 30 minutes of being idle, to prevent
you from forgetting to set it back to automatic operation.
• Load Output Level: Output level in A/D values. The value is constantly updated in accordance to relay
operation and output level change. This value is used to calculate the A/D threshold value to be considered as
a short circuit.

6.2 Digital Input

The Digital Input test screen allows you to verify the proper operation of digital inputs and sensors. Digital inputs are
defined as meters (water meters, dosing meters, etc.) that count the number of closed contacts from 0 to 255 and
TEST
1. RELAYS
2. DIGITAL INPUT
3. ANALOG INPUT
4. TEMPERATURE
5. HUMIDITY
TEST RELAYS
OUTPUT
FUNCTION
1
DOSING CHANNEL 1
2
DOSING CHANNEL 2
3
DOSING CHANNEL 3
4
DOSING CHANNEL 4
5
DOSING CHANNEL 5
6
DOSING CHANNEL 6
7
DOSING CHANNEL 7
8
DOSING CHANNEL 8
STATUS
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF