Operation - Mira Elite QT Installation & User Manual

9.8kw / 10.8kw
Table of Contents

Advertisement

Operation

Please read "Important Safety Information" before using the shower for the first time.
1
Switch electrical supply on and start
shower.
3
Allow a few seconds for any temperature
adjustment to take effect.
Allow temperature to stabilise before
making a new adjustment.
5
Stop shower and switch electrical
supply off.
1265606-W2-A
2
Set power control to low / eco / high.
Adjust temperature control until desired
showering temperature is reached.
4
Check
water
entering shower. Spray pattern can be
adjusted while showering.
6
Residual water may drain for a few
minutes.
20
temperature
before

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

J08jJ08i

Table of Contents