Three-phase three-wire system
*Two CTs are required to measure three-phase three-wire system.
Three-phase four-wire system
*Three CTs are required to measure three-phase four-wire system.
KW8M Eco-POWER METER (1A/5ACT input type)
Back View
Back View
6