Device Addressing - Trane Tracer Summit Hardware And Software Installation Manual

Building automation system version 16
Hide thumbs Also See for Tracer Summit:
Table of Contents

Advertisement

Chapter 5 UCM Wiring and Addressing
1
Link 1
2
3
Device #1
4
Link 2
5
6
Comm Link
7
Terminal Block
Link 3
8
9
10
Link 4
Shield
11
12
Cut and tape
the shield
wires together.
102
Figure 49. ICS Connections Between the BCU and U.S.-built Scroll
Chiller (CGA/CGW and CGAF) UCMs on an Isolated Comm3 Link
Device #2
Device #3
Comm Link
Comm Link
Terminal Block
Terminal Block
Shield
Shield
Cut and tape
Last device on
the shield
the Comm4 link
wires together.

Device Addressing

Each UCM must have a unique address that is set using a DIP switch on
the scroll chiller. For CGA/CGWs, the location of the address DIP
switches is shown in Figure 47 on page 100. For address DIP switch set-
tings for CGA/CGWs, refer to Table 17 on page 103.
For CGAFs, addresses are set from the front panel. Refer to the CGAF
installation, operation, and maintenance manual for details.
Cut and tape
back the
shield wire.
BMTW-SVN01F-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents