40
R-Series v5 Instruction Manual
3. For operations involving the state of the outlets, setting Delay to True will use the
current Delay configuration for each outlet when performing the selected operation.
4. Select Submit to issue the action.
Phase/Circuit Operation:
1. Click the Operation icon. For Phase/Circuit operation only the Reset Energy (kWh)
operation is available.
2. Click the Submit button to reset the energy of the Phase/Circuit.
GM1196 R-Series v5 Instruction Manual
NOTE
Power-on action delays reference the time since the unit was
plugged in, not the time since it fully booted. They may execute
before the unit fully boots.
Figure 3-6 Phase/Circuit Operation Page