Operation Of Link Relays And Link Registers - Panasonic AFP7CPS4E User Manual

Fp7 series, programmable controller
Table of Contents

Advertisement

6.1.2 Operation of Link Relays and Link Registers

 Link relay
If the link relay L0 in unit No.1 is turned on, the status change is fed back to the link relay L0
with the same number in other units, and R0 in the other units is output.
R0
L0
PLC
R0
F0, MV, K100, LD0
No.1 Link register
LD 0
 Link register
If the constant 100 is written into LD0 of the source station no.1, LD0 of the other station no.2
is also changed to the constant 100.
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com
L0
PLC
No.2 Link register
LD 0
100
6.1 Operation of PLC link MEWNET-W0
Y0
L0
PLC
RS485
No.3 Link register
100
LD 0
Y0
L0
PLC
No.4 Link register
100
LD 0
Y0
100
6-3

Advertisement

Table of Contents
loading

Table of Contents