2 Installation and connection
2-3 Connect the AC input
2-3
Connect the AC input
When the installation and device connection operation is completed, connect the "AC
input" plug of the UPS into the outlet (commercial power supply).
Be sure to connect the "AC input" plug to a rated input voltage
(100VAC) commercial power supply.
Connecting to a commercial power supply with a different rated voltage
The UPS may fail.
For other cautions on connection, refer to "CAUTION (for installation and connection)"
described in "Safety precautions" in the beginning part of this manual.
Connect the "AC input" plug into a 100VAC outlet (commercial power supply).
The UPS is shipped after being charged. However, when it is used for the first time,
its backup time may have become shorter due to self-discharge.
We recommend using the UPS after charging.
"3-1-10 Disable screen savers" (P.36) can also be carried out before charging the
battery.
26
Caution (for installation and connection)
may cause a fire.
References
BL50T/BL75T/BL100T