Download Print this page

BodyCraft F620 Instruction Manual page 12

Back & arm strength training system

Advertisement

T
OP CABLE ROUTE:THREAD CABLE-END OVER T1, T2 DOWN AND AROUND
L
OW CABLE ROUTE:THREAD EYELET END OVER L1 DOWN AND AROUND L2
ball-end
ball-end
T1
L1
32
6
30
S
TEP 5 INSTALL CABLE
T3 UP AND AROUND T4 END AT T5.
UP AND AROUND L3 END AT L4.
TOP CABLE(31)
LOW CABLE(32)
7
T2
T4
31
T3
15
L3
6
32
T5
L1
L4
L2
1
31
rod
9
40
31
48
30
4
5
T5
5
11
cable-end
eyelet
42
40
9
7
9
40
48
30
15
6
46
30
9 40
9
40
48
30
1
46
L4
32
23
1
42
40
9
42
42
42

Advertisement

loading