Validating The Cable's Shield - Fluke IT200 User Manual

Intellitone pro toner and probe
Table of Contents

Advertisement

IT200
Users Manual

Validating the Cable's Shield

To use the probe's SYNC LED for shield validation during
cable map tests, do the following:
1.
Remove the battery door and disconnect the battery
from the probe, as described under "Battery Life and
Replacement" on page 16.
1.
Turn the probe's rotary switch to CABLE MAP.
Note: The battery must be disconnected from the
probe for at least 30 seconds.
2.
Replace the battery and battery door.
The SYNC LED will now indicate a good, open, or shorted
shield as described in the previous section.
12
To disable shield validation via the probe's SYNC LED, do
the following:
1.
Remove the battery door and disconnect the battery
from the probe.
2.
Turn the probe's rotary switch any position except
CABLE MAP.
Note: The battery must be disconnected from the
probe for at least 30 seconds.
3.
Replace the battery and battery door.

Advertisement

Table of Contents
loading

Table of Contents