Starting-Up Your Ft-50 - Filtec FT-50 Operation Manual

Fill level inspector
Table of Contents

Advertisement

FT-50 Fill Level Inspector Operation Guide

Starting-Up Your FT-50

No.
Description
1
Power On Indicator (Green Light)
2
Main Power Switch (External Junction Box only)
2-2
The start-up procedure for the FT-50 is simple and quick. Your FT-50 can
be ready for operation in as little as 5-seconds from the moment you turn
on the main power to the unit.
1. If your FT-50 is not equipped with an automatic safety shutter, verify
the manual safety shutter is in the "on" position (opened). For more
information see "The Safety Shutter" on page 2-3.
2. Locate the main power switch for the unit. If your FT-50 has the
external junction box option installed, the switch is located on this
box. If the external junction box is not installed, and the main power
switch is not readily discernible, contact your plant service personnel
for assistance.
Figure 2-1. Location of main power switch on external junction box.
3. When the power is turned on, the amber beacon on top of the unit will
light briefly and then extinguish. If the external junction box is
installed, the green power indicator light on the junction box will light
while the power remains on.