Adjustment Procedures - Integra RDA-7 Service Manual

Seven channel amplifier
Hide thumbs Also See for RDA-7:
Table of Contents

Advertisement

RDA-7

ADJUSTMENT PROCEDURES

Channel Test
1. Connect the assembled channel to the power transformer and
turn it ON.
2. After about 9 seconds the two green LED's should turn ON
3. Measure the following voltages and make sure they are within
the specifications: For all these measurements connect the DC
voltmeter negative lead to the bottom lead of the VR8 zener
diode.
C7 (+)
70V +/- 3V
C9 (-)
-70V +/- 3V
L1
0V +/- .1V
Main Chassis Test
1. Assemble the chassis/power supply and configure it for right
line voltage.
2. Plug it into the power line.
3. Turn the unit ON. The blue ON LED should come ON.
4. Red Fault/Standby LED should be flashing.
5. Turn the unit OFF and plug a remote control plug into the
Remote IN jack.
Final Assembly Test
1. Install all channels in the chassis and turn the unit ON. All
green LED's should come ON after about 9 seconds.
2. Check bias currents on all channels and adjust if necessary.
3. Allow the unit to warm up for 30 minutes, adjusting the bias
currents every ten minutes.
4. Adjust the DC output voltage as close to zero as possible on
each channel.
4. Connect a DC voltmeter to the test points TP1 and TP2 and
adjust the voltage to 4mV using the R46 BIAS adjustment
trimpot.
5. Allow the channel to warm up for 30 minutes, adjusting the
bias every ten minutes.
6. Measure the output DC voltage and adjust it as close to zero
as possible using the R24 trimpot.
6. Turn the unit ON. The Red Standby LED should be ON.
7. Apply 12V to the remote control plug. The unit should turn
ON, the blue LED should be ON and the red LED flashing.
8. Measure the secondary voltages on all power cables going to
the channels. Each secondary should read 50VAC +/- 2VAC.
18

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents