Installation - Cecilware ME10EN Operator's Manual

Hide thumbs Also See for ME10EN:
Table of Contents

Advertisement

Installation

Unpacking Instructions
Carefully unpack the machine and inspect immediately
for shipping damage. The packaging may contain
unattached parts. Your machine was shipped in a carton
designed to give it maximum protection in normal
handling. It was thoroughly inspected before leaving
the factory. In case of damage, contact the shipper, not
Grindmaster-Cecilware.
NOTICE:
The person installing this appliance is
responsible for ensuring that electric and water
connections meet the requirements of the national
electric code, national plumbing code, and any local
ordinances.
See Rough-in Drawing for approximate dimensions
and location of water input.
NOTE: When positioning the unit, leave a minimum 6
inch (15 cm) clearance on the right side of the water
boiler for ease of service.
Water boilers are shipped with the thermostats in the
OFF position. Do not turn the thermostat ON before
filling the water boiler with water.
CAUTION
These urns are heavy pieces of equipment. It is
recommended that moving or lifting the unit be done
by two people to avoid injury.
Mechanical Installation
NOTICE:
Do not turn thermostat on until all
installation instructions have been followed.
1. Inspect unit to see if any damage occurred in
shipment.
2. Remove the boiler from the packing material. The
four legs, faucets, and vent cap drain are packed
separately with water boiler.
3. Install legs by tilting boiler on its side and screwing
legs into leg supports until hand tight.
4. Carefully right unit and install in its permanent
location, being sure to leave at least 6" (15 cm) on
right side of boiler for access to controls. Position
boiler so that the faucet drips into a drip trough or
drain receptacle of some type.
5. Level the boiler by adjusting the bottom pad of the
legs.
6. Place the vent cap into the recess in the top of the
unit.
7. Mount the faucet assembly onto the shank.
4
Water Hook-up
NOTICE:
This equipment must be installed in
compliance with applicable Federal, State and/or Local
plumbing codes having jurisdiction. This product requires
an approved backflow prevention water device, such as
a double check valve, to be installed between the
machine and the water supply. Incoming pressure should
be greater than 30 psi and not more than 70 psi.
NOTICE:
Connecting the water boiler to a warm
water supply will speed up heating and recovery times.
1. The boiler is equipped with a ¼" Flare water inlet
fitting, which is located on the back of the unit.
2. Provide shut-off valve and union in supply line near
boiler.
3. Minimum inlet pressure at boiler should be 30 PSI.
4. Maximum inlet pressure recommended at 70 PSI.
5. Copper flex tubing should be used for valve
connections.
6. Turn on the water supply line and check for leaks.
NOTE: A filtering system is recommended to remove
odors and inhibit lime and scale build up in the unit.
NOTE: In areas with extremely hard water, a water
softener must be installed in order to prevent mineral
deposits that will cause malfunctioning of the
equipment.
Electrical Hook-up
WARNING: ELECTRIC SHOCK HAZARD!
Installation of this appliance should be performed by
qualified service personnel only. Improper installation
could result in electrocution.
NOTICE:
This equipment must be installed in compliance
with applicable Federal, State and/or Local electrical codes
having jurisdiction. Do not use extension cords. Make sure
that the outlet is properly grounded.
1. Check rating marking on boiler nameplate to be
sure electric lines match voltage, phase, and
amperage requirements of boiler. Select the proper
cord and cord grip for electrical rating of the boiler.
2. 120V water boilers are provided with 120V/15A
grounding plug. Units must have a separate
120V/15A outlet.
3. 208/240V water boilers are provided with a terminal
block inside the control box. Field wiring must be
performed by a qualified serviceman. 1 and 3
phase hook-up for units with terminal blocks. To
access terminal block, remove the fastener on the
cover and slide off cover. Install a suitable conduit
and connect copper wires to terminal L1 and L2
(and L3 for 3 phase unit only) and a #14 AWG
ground wire to the ground lug.
Cecilware
®
Water Boilers

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Me15enCme15e-nCme10e-n

Table of Contents