1
Quick installation guide
1.4
Measurements, clearances and accesses
1.4.4 General dimensions, VIR 45A, VIR 60A
A
B
3
5
4
A.
Minimum clearance 600 mm
B.
Minimum clearance 800 mm
1.
Gas connection 1 ‑ 1/8" (x2)
2.
Liquid connection 1/2" (45A), 5/8" (60A) (x2)
3.
Hot water coil accessory connections
4.
Electrical connections
5.
Motor access panel
6.
Filters
7.
Drain pipe (outer diameter 28,5 mm)
8
A
21
1
2
6
7