5167515-YIM-H-0518
Before lifting, make sure the unit weight is distributed
equally on the rigging cables so it will lift evenly.
Units may be moved or lifted with a forklift. Slotted openings in
the base rails are provided for this purpose.
LENGTH OF FORKS MUST BE A MINIMUM OF 60 INCHES.
All panels must be secured in place when the unit is
lifted.
The condenser coils should be protected from rigging
cable damage with plywood or other suitable material.
LEFT
A
Figure 5: Unit 4 Point Load Weight
Table 2: Weights and Dimensions
Size
Weight (lbs.)
Model
(Tons)
Shipping Operating
078
ZH
915
(6.5)
090
ZH
915
(7.5)
102
ZH
1052
(8.5)
120
ZH
1095
(10)
150
ZH
1285
(12.5)
8
FRONT
B
D
Center of Gravity
X
Y
910
38
24
910
38
24
1047
38
24
1090
38
24
1280
48
24
A
Figure 6: Unit 6 Point Load Weight
Figure 7: Center of Gravity
C
4 Point Load Location (lbs.)
A
B
C
D
212
158
230
309
212
158
230
309
244
182
265
356
254
189
276
371
240
281
410
350
LEFT
C
B
F
Y
X
LEFT
6 Point Load Location (lbs.)
A
B
C
149
121
100
149
121
100
171
139
116
178
145
120
156
173
192
Johnson Controls Ducted Systems
FRONT
D
E
FRONT
D
E
F
147
177
217
147
177
217
169
203
249
176
211
260
280
252
227