Weights And Dimensions; Unit 4 Point Load Weight; Unit 6 Point Load Weight; Center Of Gravity - York ZKT06 Installation Manual

Table of Contents

Advertisement

If a unit is installed on a roof curb other than a
TempMaster roof curb, you must apply gasketing to all
surfaces that come in contact with the unit underside.
Before lifting the unit, make sure that the unit weight is
distributed equally on the rigging cables so that it lifts
evenly.
Units may be moved or lifted with a forklift. Slotted openings in
the base rails are provided for this purpose.
THE LENGTH OF THE FORKS MUST BE A MINIMUM OF 60
INCHES.
All panels must be secured in place when the unit is
lifted.
The condenser coils must be protected from rigging
cable damage with plywood or other suitable material.
Table 3: Weights and dimensions
Weight (lbs.)
Size
Model
(tons)
Shipping Operating
T06
ZK
962
(6.5)
T07
ZK
970
(7.5)
T08
ZK
1205
(8.5)
T10
ZK
1205
(10)
T12
ZK
1470
(12.5)
Johnson Controls Ducted Systems

Center of gravity

X
Y
957
38
23
965
38
23
1200
38
25.5
1200
38
25.5
1465
51
25.5
LEFT
A
Figure 5: Unit 4 point load weight
A
Figure 6: Unit 6 point load weight
Figure 7: Center of gravity
4 point load location (lbs.)
A
B
C
D
214
159
249
335
216
161
251
337
297
221
291
390
297
221
291
390
270
363
477
355
B
D
LEFT
C
B
F
Y
X
LEFT
6 point load location (lbs.)
A
B
C
150
122
101
151
123
102
208
170
141
208
170
141
172
207
254
5121835-TIM-J-1118
FRONT
C
FRONT
D
E
FRONT
D
E
F
159
191
234
160
193
236
185
223
274
185
223
274
334
272
226
9