13.3.7
Pump Down Operation By CN-S
A convenience method to activate pump down operation.
Control start condition:
During power standby condition, short CN-S continuously between 1 second and 10 seconds.
o
Control stop condition:
480 seconds after pump down operation starts.
o
CN-S is shorted again during pump down operation.
o
59