GE SecoGear User Manual page 31

24kv-27kv air insulation switchgear
Table of Contents

Advertisement

Both the screws can be accessed only when the
earthing switch is in OPEN position
Open the padlock on the operating hole of the earthing switch
Draw out the drive rod forward, then the parts of the drive rod
in the switchgear can be removed from backwards now.
Attention: Don't fully remove the drive rod, otherwise all
the parts will fall out.
Completely draw out the drive rod from another side at a
slight angle.
Loosen the 4 fixing screws on the fixing bracket (see figure
6/6), and then remove drive rod of the rear door interlock from
rear door, then draw out the drive rod backward.
Attention: Replace the bevel gear assembly and
earthing switch in the same way. Use care to avoid
damage as the main body is much heavier.
Unscrew both of the bolts on the bevel gear (See figure 6/7).
Unscrew the flexible connections between the earthing switch and common earthing busbar (see figure 6/8)
Remove the fixing screw of the earthing switch, and then push the bevel gear and the main body of the earthing switch (See figure
6/9)
Now replacement can be done with the above instructions following the previous instructions in reverse order.
Figure 6/9: Fixing screw of the earthing switch
Figure 6/7: Fixing screw of bevel gear
Figure 6/8: Flexible cable between earthing Switch and earthing
busbar
Remove 6 fixing
screws
o
f
the
earthing switch
SecoGear 24kV-27kV Air Insulation Switchgear
Fixed screw of
the bevel gear
Flexible connection
of the earthing
switch and earthing
busbar
28