Glas Craft MH II User Manual page 16

Hide thumbs Also See for MH II:
Table of Contents

Advertisement

Section 2 - Operation: Start-Up Instructions
15.
If one side registers considerably more pressure
than the other side, go to the high pressure side
and bleed off some pressure by slightly opening
the manual material valve on the side block over
the container. Bleed pressure until both sides are
approximately the same pressure.
Material will dispense at high pressure. follow all
safety precautions
16.
Relieve any excess pressure by triggering the gun.
The Emergency Stop Switch is located on the top
right side of the Box Panel, when depressed, it will
shut down the power to the system. To reset, turn the
"red" push button.
17.
The system is now ready for operation.
14

Advertisement

Table of Contents
loading

Table of Contents