9.
Turn on hose control:
a. Push in the green button.
b. Press either up or down arrow buttons on the
controller until desired temperature setting
is achieved.
10.
Turn on the ISO & POLY Heaters.
Green Power Button
Turn transfer pump air regulator on slowly. Pumps
should cycle slowly until hoses are full of material.
Straighten hose out flat, to avoid uneven heating and
damage to internal wiring of the hose assembly.
11.
Turn on Hydraulic Power Pack
Allow enough time for hose to warm up (approx. 30
minutes). Remember that the heated hose does not
have a delta rating. The heated hose's function is to
maintain the heat generated by the primary heaters
during system operation, and preheat material during
initial start-up. The hose should be set to maintain a
temperature close to the set point of the primary
heaters.
Section 2 - Operation: Start-Up Instructions
To see the actual temperature of the liquid in the hose,
push the blue button once and release. The actual
temperature will then be displayed for 10 seconds.
12.
Adjust temperature to desired setting. ISO and POLY
controllers function exactly the same as the hose
controller.
Allow enough time for the material to be heated
(approximately 3-5 minutes).
13.
Slowly adjust hydraulic pressure knob clockwise
on the system to desired pressure.
14.
Turn purge air and material valves ON at the gun.
ON
13
Pressure Knob
OFF